Microsoft Word 1.1 for Windows–Complete Original Floppy Disk Set–Vintage 1990 – Dominando o Powerpoint
Microsoft Word 1.1 for Windows–Complete Original Floppy Disk Set–Vintage 1990

Microsoft Word 1.1 for Windows–Complete Original Floppy Disk Set–Vintage 1990

USD 119.99 USD
SKU: IKFFkdza
Brand: Microsoft
Condition: Very Good

Original floppy disk set (all disks present). This is an original, authentic set ofMicrosoft Word 1.1 installation disks — one of the earliest Windows versions of Microsoft Word and a highly sought‑after piece of software history.

Specifications

Brand Microsoft
Type Office Software Suites
Format Floppy 3.5"
Unit Type Unit
Language English
Minimum Hard Drive Space Less than 50 MB
License Category Standard
Minimum RAM 64 MB
Model Microsoft Word 1.1
Minimum Processor Speed 66 MHz
For Operating Systems Windows

What stands out about this item is the Microsoft brand, and it looks clean on any desk.

Related Products

Nuance Dragon Naturally Speaking Basics – Version 12 (DVD, 2013 1-Disc) Open Box
Nuance Dragon Naturally Speaking Basics – Version 12 (DVD, 2013 1-Disc) Open Box
30.00 USD
Microsoft Dell Microsoft Windows XP Operating System Driver PC Software (R2352)
Microsoft Dell Microsoft Windows XP Operating System Driver PC Software (R2352)
15.00 USD
Microsoft Digital Image Standard 2006 LB Old Version Visit the Microsoft Store P
Microsoft Digital Image Standard 2006 LB Old Version Visit the Microsoft Store P
155.00 USD
Rare Vintage Microsoft Project Designed for Windows 95 New / Open Box
Rare Vintage Microsoft Project Designed for Windows 95 New / Open Box
15.00 USD
Open Office Software Suite for Windows – For Home Student Professional | CD-ROM
Open Office Software Suite for Windows – For Home Student Professional | CD-ROM
19.99 USD
☎ Oracle Primavera P6 Training software 300+ Hours + FREE Support
☎ Oracle Primavera P6 Training software 300+ Hours + FREE Support
129.99 USD
Visio 2000 Professional Upgrade (New! Factory sealed retail box)
Visio 2000 Professional Upgrade (New! Factory sealed retail box)
9.99 USD
Dragon NaturallySpeaking Speech Recognition Software Basics Version 11 By Nuance
Dragon NaturallySpeaking Speech Recognition Software Basics Version 11 By Nuance
24.99 USD
Microsoft Visual Studio 6.0 Service Pack 4
Microsoft Visual Studio 6.0 Service Pack 4
89.30 USD
FileMaker Mobile Companion for Palm OS Windows Mac Palm PC – Brand New & Sealed
FileMaker Mobile Companion for Palm OS Windows Mac Palm PC – Brand New & Sealed
57.02 USD